Project no Project no 316
District project:
up to 1 000 000 zł
The correction of the course and condition of the south-west-northeast traffic route in Park Słoneczny [WBO. 2023]
-
Category pedestrian/cycling
-
Budget verified 1 000 000 zł
-
Status Not elected
-
223
Statistics votes
Project description
Due to its location, Park Słoneczny has a recreational function and a communication function for the residents. At the design stage of the establishment, the continuity of the existing route from the south-west (Orzechowa and Jabłeczna Streets) to the north-east (Krynicka Street) intensively used due to the access to the trade zone in Krynicka, Widna and Bardzka Streets, was not preserved. The alleys laid out in this area acquired a purely walking and sports character, which translated into their width and the type of surface used. That has resulted in the worn-out substrate of the paths causing large puddles, which freeze in winter. The surface of the ways is uneven with individual pieces of gravel, and the trampled paths are muddy.
Liczba głosów ogółem
Do nieważnych zostały zaliczone przypadki niezgodnego z zasadami wypełnienia kart papierowych, niepotwierdzenia głosu kodem SMS, powtórnego oddania głosu z użyciem tego samego nr PESEL.
Liczba głosów: internet - papier
Głosy można było oddawać w 2 formatach: poprzez internet oraz w formie papierowej. Głosy w formie papierowej były wprowadzane przez wyznaczonych pracowników UM Wrocław w dniu 12.10.
Dotyczy głosów ważnych.
Internet
223Papier
0Płeć: kobiety - mężczyźni
Podział głosów oddanych przez mieszkanców według płci, obliczony na podstawie podawanych numerów PESEL.
Dotyczy głosów ważnych.
Kobiety
109Mężczyźni
114Wiek głosujących
Podział głosów oddanych przez mieszkanców według grup wiekowych, obliczony na podstawie podawanych numerów PESEL.